Prioritized Labels
  • Doing
    • Project label
  • Review
    • Project label
  • low
    These are tickets that are useful, but we may or may not have time to do them. We can release the code if those are not done.
    • Project label
  • high
    High priority are things that are very important. Do them before other tickets, but generally follow normal workflow.
    • Project label
  • critical
    Tickets that are emergency and need to be dealt with immediately (as in "drop everything, everyone work on this issue")
    • Project label
  • Other Labels
  • API
    Requirements and issues related to using Stork via api interfaces rather than gui
    • Project label
  • BIND
    • Project label
  • BIND configuration
    Requirements and issues associated with BIND 9 configuration
    • Project label
  • HW OS platform
    • Project label
  • Kea
    Requirements and issues associated with configuring Kea through Stork
    • Project label
  • Kea configuration
    • Project label
  • Metrics and reporting
    • Project label
  • agent
    • Project label
  • backend
    Requirements, issues and tasks related to backend (go, gin-gonic)
    • Project label
  • bug
    • Project label
  • build
    Anything related to installing dependencies, compiling and installing the software.
    • Project label
  • ci
    Tasks related to Continuous Integration.
    • Project label
  • cli
    Anything related to stork-cli, a command line interface tool.
    • Project label
  • database
    StorkDB
    • Project label
  • design
    Issues marked with this label require a new design or may involve updating existing one.
    • Project label
  • doc
    • Project label
  • grafana
    • Project label
  • install
    Requirements and issues associated with Stork installation and upgrade
    • Project label
  • monitoring
    Requirements and issues related to monitoring, operational status and alerting
    • Project label
  • prometheus
    • Project label